Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
ConocoPhillips
|
2016 Analyst Day
| Ryan Lance; Don Wallette; Al Hirshberg; Matt Fox | Page 52 of 11 |
November 21, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"2016 Analyst Day"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
Bakken: Increasing EUR While Driving Down Costs • ~620 M net acres; 0.7 BBOE resource <$35/BBL average CoS • Optimizing recovery through improved completion design • Pilot program confirmed spacing and infill potential of Middle Three Forks • Reduced completed well costs by ~45% 2016 vs. 2014 Middle Bakken 2014-2015 Completion Optimization 0 100 200 300 0 100 200 300 400 Cumulative Oil (MBO) Days Online 40% INCREASE 2011-2013 Design 2014-2015 Design 2016-2017 Completion Optimization Provides Encouraging Results in Middle Bakken Cumulative Production (MBOE) Productivity Index (BOED/Delta psi) Lowest Well Cost/BOE 1 Competitors 2 Well Cost ($/BOE) 2014-2015 Design 2011-2013 Design 2016-2017 Design 1