Close
❮
❯
Enverus Home
docFinder
M&A
Learn More
Videos
About Us
Contact Us
Register
Log In
Username (email)
Password
Remember Me
Forgot Password?
or
Sign Up Now!
New Search*
Back to Results
Note: Only one slide is currently available because you are not currently logged in.
Full Document
Key Slides
Tamarack Valley Energy Ltd
|
June 2015 Corporate Presentation
| Brian Schmidt | Page 7 of 11 |
November 21, 2024
Save
Email
Print
View in Results
toolButton
prevButton
nextButton
prevKeyButton
nextKeyButton
prevKeyButton
nextKeyButton
byDateAscButton
byDateDescButton
byCompanyNameAscButton
byCompanyNameDescButton
hidden
hidden
Document:
"June 2015 Corporate Presentation"
View Full Document
×
Search Selection
Search by Text
Search
Search by Slide
Search
Cross reference your docFinder results against PLS' extensive news archives.
For demo or training contact Melwyn Oommen,
melwyn.oommen@drillinginfo.com
Slides may show historical information no longer relevant. All slides to be viewed in context of the entire presentation and time. See
Legal Disclaimer
.
Next 200
First
Previous
Zoom
Next
Last
7 Wilson Creek after Tuck-in Acquisition • Connect new infrastructure to TVE gathering systems ($2 mm NPV10 savings on gas processing) Alder Flats 1-29 Gas Plant • Reduce P/L length by 2/3, size by 2” ($3.5 mm savings) • Eliminate battery and compression at Alder Flats ($2.5 mm savings) Pembina Pipeli ne TVE land Acquisition land Existing Cardium producers Existing vertical Cardium oil wells Q4/14 Drills 2015 Drills Gas plant Battery Pembina oil pipeline Nova gas pipeline Field gathering lines Proposed pipeline Infrastructure on acquisition land