As part of its transition toward a Lower Eagle Ford development drilling program that commenced in 2017, Laredo Energy VI has completed nine wells in the Eagle Ford dry gas window in Webb County, Texas. All wells were drilled on 1,000-ft well spacing. The Reuthinger 123H and 124H were drilled on the same pad with laterals measuring 7,791 ft and 8,576 ft, respectively. The 123H generated an IP rate of 12.2 MMcf/d at flowing......
Provide your credentials to access this page
Member Area: Log in if you have a PLS web account or Sign up for internet access now.